Notices
We make every effort to inform the university of upcoming work, especially when it might impact teaching, learning, research, and other work activities.
The dates in this list are the date when we posted the notice. The dates and times when the work will take place are listed in the notices themselves.
Recent notices
-
Pathway Remediation near HSD and HHB
-
Pathway Remediation between JCC and CLE
-
Multifaith Centre Pathway Remediation
-
Tactile Warning Mats and Directional Indicators Installation
-
Tactile Warning Mats and Directional Indicators Installation Feb 19
-
Fraser Building New Wing - Stair Flooring Repairs
-
ELW Elevator #39 - Out of Service
-
RCH Hallway 101H Grills
-
R43 Building Heating System Repair
-
Tactile Warning Mats and Directional Indicators Installation - Lane Closure
-
PCH Air Balancing and Repairs Schedule Update Revision 2
-
COR PSYCH Clinic Safety and Accessibility Upgrades
-
DTB Power Shut-down
-
JCC Panel Upgrades Updated
-
PCH Water Shutdown
-
CLE, LIB Ceiling Removal
-
Sedgewick C-Wing Deck Replacement
-
Tactile Warning Mats and Directional Indicators Installation
-
UH2 Windows & Doors Replacement
-
Human & Social Development Building Renovations
-
CLE Elevator 15 Renewals - ON HOLD
-
ELW-ECS Skywalk Short-term Reopening
-
Engineering/Computer Science - Rooms 442 & 448 Construction
-
Clearihue Flooring replacement
-
CST 086 Renovation
-
JCC Panel Upgrades
-
Marine Biology Teaching Lab Upgrade - Extension
-
ELL Chiller Replacement
-
Petch Marine Biology Lab Reno
-
Petch, Elliott, Cunningham Chiller Replacement
-
ELW to ECS Walkway Repair - Extension
-
Cheko'nien House - Siding Repairs - Revised Date
-
Fraser Building - Weekend Work on Classroom AV Systems
-
RESS One Card System and CCTV Infrastructure Installation Phase 1A
-
ELL Elevator 4 Out of Service - Update Date #2
-
RESS One Card System Installation Phase 1A
-
Engineering Expansion Project – Crane lift of Cladding materials
-
Heating Loop 501 Replacement
-
Marine Biology Teaching Lab Renovation
-
510 Bed Project – TP-01 Linear Infrastructure Scope
-
BEC All Gender Washroom Reno
-
RESS CCTV Infrastructure Installation
January 7, 2026
-
BEC All Gender Single-User Washroom - Rooms 203 and 103
-
Petch Air Balancing
December 23, 2025
-
BEC Nets Upgrade data cable replacement
December 22, 2025
-
Engineering Expansion Project - December 23 - Ring Road Traffic
-
Engineering Expansion Project - Ring Road Delays
-
Engineering Expansion Project - ECS Level 1 Southwest Stairwell
-
Petch Building Air Balancing
-
BEC Washroom Reno
December 17, 2025
-
BEC - water reconnection
December 16, 2025
-
Rainbow Crosswalk Lane Closures (Revised Dates)
-
HSD building planned power shut-down
-
LIB-CTRemoval
December 11, 2025
-
HSD-Power-Shutdown20251224
December 11, 2025
-
RainbowCrosswalkGPRScan
December 11, 2025
-
RainbowCrosswalkLaneClosures
December 11, 2025
-
Ian Stewart Complex - Power Shutdown
-
McKinnon Building Damper Removal
-
Cunningham building mechanical room abatement
-
Cheko'nien House - Dishwasher Exhaust Ductwork
-
Health and Wellness Building (HWB) 78000 panel enclosure upgrade
-
ELW Design Studio - Fire Alarm Testing
-
ELW Design Studio fire alarm testing
-
Continuing Studies Building Air Damper Replacement Wire Pulling
-
Medical Sciences building (MSB) air damper replacement wire pulling
-
Petch Building Air Balancing
-
Business & Economics Building Generator Testing
-
All Gender Single -User Washroom Reno
-
RCH TD ATM Installation
-
ELW Elevator #39 Modernization