24-06433 Engineering Lab Wing (ELW) B231 Renovations - Second Floor - 2N Panel Power Shutdown
Engineering Lab Wing (ELW) Second Floor
Facilities Management working with Aral Construction (2014) Ltd will be completing the ELW B231 Energy Generation Lab renovations.
The project requires a one hour 2N panel shutdown to install a new lab breaker. FMGT Electrical reps will be supporting the electrical sub trade, Belltech Systems with the power shutdown.
The affected areas identified on the panel schedule are; B225, B231, B231a, B232, B232a, B237, B238, B239, B239a, B239b, B254, B258 and B264 receptacles. There is a risk that adjacent areas on the second floor that are not identified on the panel schedule could be affected.
Sorry for any inconvenience this project may cause as we complete this research laboratory upgrade.
Friday, May 16 – 6.00am-7.00am approximately
View/Download Facilities Notice: ELW Second Flr-2N Pnl Power Shutdown
Contact/ Organizer Name: Gord shirley, Project Manager