Petch – Bio Safety 2 Lab Renovation – Corridor Work
PCH – Corridors 201D and 201E (see drawing below)
Facilities Management and Aral Construction are renovating a
research laboratory in Petch to align the space to Bio-Safety-Level 2
containment standards.
Conduit installation in ceiling of corridor. Elevator L24 will
be inoperable from 7am – 11am. Washrooms 202 and 203
will be unavailable from 7am – 11am. Work areas will be
delineated with safety cones and caution tape.
General work associated with this notice to occur between 7:00am
– 3:00pm on Monday November 9
View/Download Facilites notice: Petch – Bio Safety 2 Lab Renovation – Corridor Work
Contact/Organizer Name: Jason Minard, Project Manager
Contact/Organizer Email address: jminard@uvic.ca