Harry Hickman Building, Building #215 – Legacy Controller #4 Upgrade
Facilities Management has contracted SRD Controls to update the Building Automation System DDC Controller in the upper mechanical room #202. This controller is responsible for running the heating water system and air handling equipment. The building will undergo normal morning warm up if needed prior to the controller being replaced. Ventilation equipment will continue to operate in a MANUAL state. Temperatures in occupied spaces may fluctuate throughout the day.
Following the controller upgrade, all the system Inputs and Outputs (HVAC, temperature sensors, heating control valves, etc.) will be tested to ensure they operate as expected.
View/Downlaod Facilities Notice: Harry Hickman Building, Building #215 – Legacy Controller #4 Upgrade
Time frame: Thursday, October 1, 2026