This website stores cookies on your computer. These cookies are used to collect information about how you interact with our website and allow us to remember your browser. We use this information to improve and customize your browsing experience, for analytics and metrics about our visitors both on this website and other media, and for marketing purposes. By using this website, you accept and agree to be bound by UVic’s Terms of Use for web and social media privacy.  If you do not agree to the above, you can configure your browser’s setting to “do not track.”

Skip to main content

Halpern Centre for Graduate Studies – Building Automation System Legacy Upgrade

Building #160 – Mechanical Room #121 and Various Rooms for re-commissioning

Facilities Management has contracted SRD Controls to update the Building Automation System DDC Controller in the mechanical room. This controller is responsible for running all HVAC equipment within the building. Note that the kitchen ventilation system will be placed into a Manual Mode for the day and will still shut down in the event of a fire alarm. Domestic hot water temperatures may drop as the day progresses since this the boiler system will be disconnected during the upgrade. Following the controller upgrade, all the system Inputs and Outputs (room temperature sensors, fans, pumps, heating control valves, etc.) will be tested to ensure they operate as expected.

Monday August 17, 2026

View/Download Facilities Notice: Halpern Centre for Graduate Studies – Building Automation System Legacy Upgrade

Contact/Organizer Name: Peter Lagan, Building Automation System Manager