Engineering Lab Wing building – Building Automation System Maintenance
Engineering Lab Wing – Legacy Controller #33A1 Upgrade
Facilities Management has contracted SRD Controls to update the Building Automation System DDC Controller in the hallway 2nd floor around room A207. This controller is responsible for running air conditioning in RM207 so the temperatures in A207 may fluctuate during the replacement.
Following the controller upgrade, all the system Inputs and Outputs (HVAC, temperature sensors, heating control valves, etc.) will be tested to ensure they operate as expected.
Monday, October 19, 2026
View/Download Facilities Notice: Engineering Lab Wing building – Building Automation System Maintenance
Contact/Organizer Name: James Lee, Building Automation System Specialist
Contact/Organizer Email address: jameswon@uvic.ca