Engineering Expansion Project – ECSE East Entry impact due to work overhead
ECSE building East Entry facing Ring Road
In support of the Engineering Expansion Project, Bird Construction and team will need to install a replacement PV panel at the ECSE level 4 roof deck. Lift access will be from the east side, and a marked control zone will be set up at ground level and at level 4, for the install and connection work. There will be impact to the level 1 walkway entry width as a result of this control zone (see attached map). Staff and students must adhere to all temporary safety signage and personnel in place.
View/Download Facilities Notice: EE-ECSE East Entry impact due to work overhead
Time frame: Wed. Sept. 23: 6:00am – 8:00am
Thurs. Sept. 24: 6:00am – 8:00am
Contact/ Organizer Names:
Orianne Johnson, Project Manager - oriannejohnson@uvic.ca
Fergus O'Neill, Project Manager - foneill@uvic.ca