ELW Safety and Energy Upgrades
Engineering Lab Wing – Maker Space and Entrance
Aral Construction and FMGT will be installing heat recovery coils in
remaining four air handlers in the Engineering Lab Wing.
In support of this work, we will be preforming multiple crane lifts at the
front entrance on two separate Saturdays. During these crane lifts, we
ask that the Makerspace remain unoccupied, to allow for safe overhead
passage of the crane boom and its load.
Please follow all posted signs and the instructions of the flagger when
entering the building.
Saturday November 14th and Saturday November 21st
7:00 am – 7:00 pm
View/Download Facilities Notice: 21-4927 ELW Safety and Energy Upgrades
Contact/Organizer Name: Jen Miley, Project Manager
Contact/Organizer Email address: jmiley@uvic.ca