BSL2 Lab Renovation
PCH 213 and 223
Facilities Management and Aral Construction are renovating a research laboratory in Petch to align the space to Bio-Safety-Level 2 containment standards. Epoxy Floor installation in PCH 213 and 223 is to occur during date and times below.
Negative Air Measures have been undertaken and corridor door will be taped off to minimize odors.
We apologize for any inconvenience.
September 8 – 12 from 7am – 7pm
View/Download Facilities Notice: BSL2 Lab Renovation
Contact/Organizer Name: Jason Minard, Project Manager
Contact/Organizer Email Address: jminard@uvic.ca