This website stores cookies on your computer. These cookies are used to collect information about how you interact with our website and allow us to remember your browser. We use this information to improve and customize your browsing experience, for analytics and metrics about our visitors both on this website and other media, and for marketing purposes. By using this website, you accept and agree to be bound by UVic’s Terms of Use for web and social media privacy.  If you do not agree to the above, you can configure your browser’s setting to “do not track.”

Skip to main content

High Voltage Upgrades - Power Outage - Area 2

Sewage Lift Station
Visual Arts Building
Phoenix Theatre
University Club
Human & Social Development Building
Fine Arts Building
Sedgewick Building
Hickman Building
David Turpin Building
Business & Economics Building
David Strong Building
Cornett Building
Jamie Cassels Centre
Clearihue Building Wings A, B, C, D
First Peoples House
McPherson Library
Heating Plant 2

UVIC FMGT is planning electrical outages in three areas across campus to support critical upgrades to the campus electrical distribution grid. This work is necessary to maintain the reliability of our high-voltage infrastructure and reduce the risk of equipment failure.

The above buildings building fall under: Area 2

The planned outage schedule is as follows:

  • Area 1: August 8, 2026, from 10:00am to 6:00pm
  • Area 2: August 4, 2026, from 8:00pm to 4:00am August 5, 2026
  • Area 3: TBD, Targeting Late 2026

Please review the following in preparation for the outages:

  • Buildings will be locked during the outage. Please ensure you have vacated the building by:  
    • Area 2- 6:00pm on Aug 4. If you need to use the elevator to leave the building, please do so by 5:00 pm. 
    • Area 1 - 8:00am on Aug 8.  If you need to use the elevator to leave the building, please do so by 7:00am. 
  • During this time, buildings will be without power, internet and WiFi.
  • Emergency lighting will remain operational throughout the outage to help maintain safe passage. 
  • Elevators will not be operational during the outage.
  • When leaving work before the planned power outage, ensure you shut down your computer, turn off monitors and other electronic devices and unplug power cords from power outlets, including power bars.
  • Do not rely on surge protectors to protect sensitive electronics or battery backup (UPS) systems to power equipment for the duration of the outage.
  • Unplug all lab equipment and attached power bars.
  • If you have food that may spoil or sensitive materials in your fridges/freezers, please dispose of or find an alternate place to move them. https://www.foodsafety.gov/food-safety-charts/food-safety-during-power-outage
  • In the event there is any equipment that does not return to operation after the shutdown, please issue a FAMIS request.
  • Additional information can be found on the web notice: https://news.uvic.ca/2026/planned-campus-power-outages/

If you have concerns about equipment or sensitive materials that may be at risk during the outage that has not been discussed with Facilities Management, please contact the designated Project Manager as soon as possible.  

Time frame: Area 2: August 4, 2026, from 8:00pm until August 5, 2026 4:00am

View/ Download Facilities Notice: Area 2 Shutdown

Contact/ Organizer Name: Harman Brar, Project Manager