Bob Wright Centre - Entire Building Power Outage

Bob Wright Centre (BWC) – Entire Building

Facilities Management, AME Consulting and Aral Construction Ltd. are working on upgrades to the HVAC and humidity controls system in the Bob Wright Centre to provide more control and efficiency to B-Wing floor 0.

A power outage is required to safely complete some electrical work for this project. For backup, there is a permanent emergency generator onsite, as well as a temporary emergency generator which will be installed in the loading bay to support critical equipment indicated by the administrative officers of the building.

All rooms or equipment not highlighted in the attached list and drawings will be affected by this power outage including building cooling, lighting, power, etc. within the building.

This shutdown will occur on a Saturday (12 hours) to reduce inconvenience to the building occupants.

Staff to clean out fridges (if possible) in the staff lounges before Friday.

Fire Alarm Masking and drain down is required for this scope of work.

The contractor will be working with UVic shops and/or departmental leads to ensure we properly shut down and start up all equipment.

We apologize for any inconvenience.

Friday, August 11, 2023 8:00am to Monday, August 14, 2023 at 11:00am (see attached for details)

View/ Download Facilities Notice - BWC Power Outage

Contact/ Organizer Name - Neel Chadda, Project Manager

Contact/ Organizer Email Address - neelchad@uvic.ca