Elliott 043b X-Ray Lab Renovations – Equipment Installation – Concrete Drilling with Handheld Power Tools

ELL 043b

An external installation contractor is scheduled to install robot arms in the room 043a in the Elliott Building. This will include drilling concrete with handheld power tools to bolt the equipment to the floor. This may cause some vibration that may transmit through the floor or walls to adjacent spaces. 

We apologize for the inconvenience and thank you for your patience.

March 11, 2024 – at approximately 5:00 pm

View/ Download Facilities Notice - ELL 043b X-Ray Lab Reno-Equipt Install

Contact/ Organizers:
Adam Gerber, Project Manager - apgerber@uvic.ca
Kim Frechette, Project Manager - kfrechette@uvic.ca