Engineering Lab Wing – B239 BSL2 Lab Upgrade – Flooring Installation

Facilities Management, Cascadia West Contracting Ltd., and RADA Resurfacing will be preparing the floor and installing epoxy flooring in ELW B239 as part of the renovations to expand and upgrade lab space for B239.

The Contractor is scheduled to grind the floor to remove unforeseen surface irregularities due to removal of interior partitions in order to prepare the surface to receive the epoxy flooring. This will be mid-level noisy work for a period of about 9 hours during the day on August 19th between 7:00 am and 4:00 pm.

Epoxy flooring will be installed starting August 20th with the curing period being complete by August 27th, 2019. The Contractor will take the necessary steps to mitigate the non-toxic odour while the work is underway, however odour may still be noticeable to the building occupants. We recommend that exterior windows adjacent to (above and below) are kept closed for the duration. There will be no access to ELW B239 until the curing process is complete.

We apologize for any inconvenience this may cause.

August 19th, 2019 from 7:00 am to 4:00 pm
August 20th through August 26th - Epoxy Flooring installation and curing.

View/ Download Facilities Notice - ELW B239 Flooring Installation

Contact/ Organizer name: Kim Frechette, Project Manager