Elliott – Level 2 and 3 – HVAC Shutdown
Elliott – Level 2 and Level 3
Facilties Management will be performing a shutdown of HVAC for project-related ductwork tie-ins with Kingsview Construction and Erb Technical. All fume hoods and supply fans on the second and third floors will be shut off for the duration of the shutdown. As part of this work the plumbing and electrical shops will be deactivating the fire sprinkler on the 2nd floor.
The fire alarm is expected to remain operational on Normal AC power.
Building occupants should pull the fire pull stations and exit the building immediately in the event of a fire emergency during these shutdowns.
Facilities Management apologizes for any inconvenience this shutdown may cause. Fume hoods cannot be used for the duration.
Saturday, November 20, 2021 – 7:00am to 3:00pm approximately
View/ Download Facilities Notice - Elliott HVAC Shutdown
Contact/ Organizer Name: Kim Frechette, Project Manager
Contact/ Organizer Email Address: kfrechette@uvic.ca